Northeast Area (2020)

Overview

Reclamation work consists of replacing all pavement, repairing and/or upgrading storm sewers and sanitary sewers, and spot replacement of curbs.  These areas include:

  • River Hills Drive
  • Happe Area
  • North Highway 13 Frontage Road

Rehabilitation work consists of replacing the top 2" of pavement and spot replacement of curbs.  These areas include:

  • Parkwood Drive
  • Travelers Trail

Contacts

Links

Updates:

See phasing map below for reference

Updates for the week of May 25-30, 2020

See updates below by phase.  Click the Weekly Construction Update (PDF) for a printable pdf version with additional information.

Phase 1

  • Complete paving final layer of asphalt early in the week

Phase 2 

  • Pouring concrete curb and sidewalk spot replacement areas

Phase 3

  • Removing curb and sidewalk spot replacement areas
  • Pouring concrete curb and sidewalk spot replacement areas

Phase 4

  • Excavation and grading on River Hills Drive from Red Oak Circle South to Kennelly Road
  • Removing curb and sidewalk spot replacement areas
  • Pouring concrete curb and sidewalk spot replacement areas

Phase 5

  • Replacing hydrants and refurbishing valves early in the week
  • Milling off top layer of existing pavement mid week (Base pavement layer will remain for solid driving surface)
  • Start installing storm sewer later in the week (16th Avenue just north of 122nd Street will be closed for this work)
Northeast Area Phasing Map